Quick answer
A council fire safety order is a legal direction to fix fire safety defects in your premises by set dates. In NSW, councils usually send a notice of intention first, giving about 21 days to respond, and you have 28 days to appeal an order. Fund the works by getting quotes early, then using cash, a property-secured loan (possible within 24–48 hours) or an unsecured loan. Speeds are possible, never promised.
Key points
- In NSW a notice of intention usually comes first, with generally 21 days to make a submission, so the first deadline arrives before any order exists
- An order can be appealed to the Land and Environment Court within 28 days of being given, but appealing does not fund the works
- Orders often schedule works in stages, so you may be able to fund the urgent items first and the rest later
- Quotes from fire contractors are what a lender needs to size the loan, so ask for them in week one
- Victoria runs a similar two-step process (building notice, then building order) with a show-cause period of usually about 30 days
The letter from council is usually short and the consequences are not. A fire safety notice or order on the building you trade from means works, quotes, a deadline and, for most owners, an invoice nobody budgeted for. The good news is that the process gives you more time than the first read of the letter suggests, if you use it properly.
This guide puts the process on a clock, shows where the money has to be ready, and sets out the funding routes that can realistically land in time.
What is a council fire safety order, and what comes first?
A fire safety order is a formal direction from council requiring the owner to fix identified fire safety problems: blocked or non-compliant exits, missing fire doors, faulty detection, inadequate sprinklers or hydrants. It lists the work and the dates.
In NSW, the order is normally preceded by a notice of intention. Council fact sheets from Wagga Wagga, Wollongong and Campbelltown all describe the same sequence: council inspects, writes to the owner saying it intends to issue an order, and invites a response before anything binding is issued. The NSW powers sit in the Environmental Planning and Assessment Act 1979 (NSW legislation).
Two things to know straight away:
- The notice of intention is not the order. It is your window to shape the order.
- Different bodies can issue them. Councils and Fire and Rescue NSW both have powers, and appeal rights differ, so check who signed your letter.
What are the deadlines, in order?
Here is the sequence with the clock for each step, based on council guidance. Your own letter overrides this table, so read the dates on it first.
| Step | Typical timing | What you should do |
|---|---|---|
| Notice of intention | Generally 21 days to say you want to make a submission (Wagga Wagga) | Book a fire engineer or certifier; ask for the inspection report |
| Submission to council | In writing, inside that window (Wollongong) | Propose scope, staging and dates you can actually meet |
| Order issued | Works listed with completion dates, sometimes staged | Get at least two quotes per item and start funding |
| Appeal window | 28 days to appeal to the Land and Environment Court (Wagga Wagga) | Decide fast whether any item is genuinely disputable |
| Works deadlines | Set in the order | Pay deposits, book trades, lodge certification |
The point most owners miss is that the notice-of-intention window is also your funding window. A submission that says “we’ll complete the exit and door works in 60 days and the sprinkler extension in 6 months, and here are the quotes” is far stronger than silence, and far easier to write if you already know where the money is coming from.
Should I appeal, or just do the works?
Councils say an owner can appeal all or part of an order to the Land and Environment Court within 28 days. Legal advice from a solicitor who does this work is worth it if you think the order is wrong, for instance if the work required seems out of proportion to the building’s use. A procedural appeal can also be available where an order was issued without a notice of intention first, other than in an emergency.
But an appeal is a legal process, not a payment plan. If the defects are real, which they usually are because a fire officer or certifier found them, the money still has to be found. Many owners do both: lodge the appeal over one disputed item while funding the rest of the works immediately.
What will the works cost?
Fair warning: there is no honest single number. Fire safety upgrades range from a few new exit signs and a re-hung door, to a sprinkler extension that touches the ceiling and the water supply. What drives cost:
- Design and certification before any work starts. A fire engineer’s report or a compliance design is often needed first. Small commercial buildings have been quoted in the low thousands for design alone, though your building may differ.
- Which items the order lists. Fire doors, egress paths, detection, hydrants and sprinklers are all priced very differently.
- Access and trade availability. A tenancy open for trading, or one where other trades must work around you, costs more than an empty one.
- Re-inspection and certification at the end. Council needs evidence, so budget for certificates and sign-off.
Do not rely on generic cost guides, many of which are American. Instead, get written quotes from licensed Australian fire contractors for each item in the order. Those same quotes are the document a lender will want, so asking for them is never wasted effort.
How do I fund the works before the deadline?
You have four realistic routes. They are not mutually exclusive.
- Cash and cash flow. If the quote is small, the fastest option is working capital, but check the hit on your tax and payroll cycle first. Our cash gap calculator shows what a one-off bill does to the next three months.
- Property-secured loan. If you own the building, or other property, it can be the security. Fast commercial property loans and fast secured business loans run from $20k to $5m, with $20k to $250k possible the same day and larger amounts possible within 24–48 hours. Using the premises as security fits well, because the upgrade itself usually protects the value of that asset.
- Unsecured cash-flow loan. For trading businesses, smaller amounts sized on turnover and bank statements can sometimes land the same day. This suits a deposit for a contractor or the first stage of works.
- Ask the landlord. Tenants should ask early whether the owner will carry some or all of the cost, or contribute. Remember that some leases push compliance costs to tenants.
If you want the paperwork side sorted in advance, our document checklist lists what a lender will ask for. And if the order is also forcing a refit, our fit-out and renovation page covers that angle.
Wondering which route fits your timeline? Check your options here and a lending specialist can talk it through against the dates on your letter.
A worked example: a three-stage order
This is an illustration, not a real client. A physio clinic owner in Wollongong leases a two-storey building they also own. Council issues a notice of intention listing a blocked rear exit, two non-compliant fire doors and an out-of-date detection panel.
- Week 1: The owner books a certifier and asks for three quotes. The exit and doors come in modest; the panel is the larger item.
- Week 2: They lodge a written submission proposing staged works: exit and doors in 30 days, panel in 90.
- Week 3: Council issues an order matching those dates. The owner’s funding is lined up before the first deposit is due, so they pay it from a short-term secured loan against the building rather than the clinic’s payroll account.
Nothing about this required a miracle, only an early start. The clinic’s biggest saving was not dollars; it was never having to close a treatment room while waiting on money.
Is Victoria different?
The shape is similar, the labels differ. Under the Building Act 1993 a municipal building surveyor issues a building notice, the owner gets a show-cause period (usually about 30 days, per council and legal guidance) to carry out the work or respond in writing, and a building order can follow if the problem remains. Responses have to reach the surveyor in writing before the period ends. Read your own notice for dates, since these are specific to each one.
What does ignoring an order cost?
More than the works. Councils can issue penalty notices for non-compliance and can take owners to court. The NSW Government’s template order states a maximum court penalty of $5 million plus $50,000 for each day the offence continues, which sets the outer limit rather than a typical result. Beyond penalties, insurers and buyers both ask about outstanding orders, and an unresolved one can slow a sale or a refinance. Treat the dates as real.
Ready to line the funding up before your date?
A fire safety order feels like an ambush, but it is really a project with a deadline, and projects with deadlines are what we help fund every day. If the numbers are in front of you, or even only rough quotes, we can look at what the premises, the business or both can support.
Enquiring takes about 60 seconds, and it won’t touch your credit file, since there is no credit check when you first enquire. We don’t send your details out to a pile of lenders, so your phone stays quiet. A real person reads your situation and calls you to talk it through. Please fill the form in accurately, including the dates on your notice and the quote totals, so we can match the right option first time.
Frequently asked questions
What is the difference between a notice of intention and a fire safety order?
In NSW the notice of intention is the warning: it says council proposes to issue an order and invites your submission. The order is the formal direction listing the work and the dates. The notice is your cheapest moment to negotiate scope and timing.
How long do I have to respond to a fire safety notice of intention?
Wagga Wagga City Council says owners generally have 21 days from the date of the notice to advise council they want to make a submission, and Wollongong requires representations in writing. Check the notice itself, because the date printed on it is the one that counts.
Can I appeal a council fire safety order?
Yes. Council guidance says an owner can appeal all or part of an order to the Land and Environment Court of NSW within 28 days. Orders from an authorised fire officer are treated differently under the Act, so read which authority issued yours.
What happens if I don't comply with a fire safety order?
Councils can issue penalty notices for not complying and can take an owner to court. The NSW Government's template order cites a maximum court penalty of $5 million plus $50,000 for each day the offence continues. Most owners never get near that, but it is why the dates matter.
I'm a tenant. Who pays for the upgrade works?
Orders are generally given to the owner, but your lease decides whether costs are passed on to you, through outgoings or a specific clause. Read the lease and talk to your landlord early, because a business that is shut by a compliance issue is the one losing trade.
Can I get a business loan to pay for fire safety works?
Often, yes. Compliance works on premises you run a business from are a business purpose. Property-secured loans from $20k up to $5m are possible in 24–48 hours, and smaller unsecured amounts are possible same day, depending on the file. Quotes help size the loan.
Does a Victorian building order work the same way?
Similar shape, different law. The municipal building surveyor issues a building notice under the Building Act 1993, you have a show-cause period (usually about 30 days) to respond, and a building order can follow if the issues remain. Check the dates on your own notice.